²»ÐàÇéÔµ

Bidding agent

Huacheng always adhere to the ¡®open, fair, justice, honesty and credit¡¯ principle and proceed from the needs of customers. According to the characteristics of different construction project planning, we formulate the implementation of the procurement and bidding scheme, through careful organization, strictly bidding and purchasing procedures. We not only attach importance to bidding and purchasing plan and specific implementation, but also pay special attention to the winning unit of the actual performance of the contract, in order to update our services and improve service levels.

Bidding agent

  • Public buildings
    • Songjiang new longteng engineering school.
  • Irrigation and water conservancy
    • College town pond "high standard farmland water conservancy project.
    • High standards of college town pudong new area in 2015 the new north village water conservancy special engineering.
    • The academy town LiXue Village high standard farmland water conservancy project (phase ii).
    • College town pudong new area LiXue Village issue of four high standard farmland water conservancy project in the irrigation area.
    • College town pudong new area is permeated with special village high standard farmland water conservancy engineering in 2014.
    • Pudong new area of large town Shao Zhai village high levels of farmland water conservancy facility project.
    • Pudong new area college town yuyao village ii five high standard farmland water conservancy project in the irrigation area.
    • Large town pudong new area dolly form a complete set of modern agricultural water conservancy project (phase iii).
    • Shanghai pudong new area large town garden village supporting special irrigation and water conservancy engineering.
    • College town four focal village (a) high standard farmland water conservancy project.
  • Rural project
    • Pudong new area from 2012 to 2014 in college town village renovation project.
    • Pudong new area college town village renovation project in 2013.
    • Pudong new area from 2013 to 2014 rivers sand town village renovation project.
    • Lingang area small water supply pipe network project in 2014.
    • College town road village, hong village, taoyuan village irrigation and drainage facilities system reconstruction project.
    • College town pudong new area in 2014 ~ 2015 economic weakness within the village road reconstruction project.
    • Renovation project, songjiang district, 2014 villages and beautiful countryside construction of pilot projects.
  • Equipment
    • West freight area in pudong airport cargo terminal 3 ULD processing equipment production and installation supervision system project.
    • Wisdom city traffic management system project to go in and out.
    • Double concurrent integrated circuit testing system project.
    • China Eastern logistics cross-border electricity project.
  • Municipal
    • Kong Li huaihe river bridge construction projects.
    • Ten of huainan city jian koto road and S310 dart shop (United States - duck back shop) road reconstruction project.
    • East lake new town of Chinese redbud road and so on six road road drainage engineering.
    • See computed.in standing cross harbour road engineering.
    • University town station weft engineering all the way.
    • XuanQiao Zhen Town north road six highway rest - a river (south) construction project.
    • Hengjing station planning 3, 9 road engineering.
    • Lingang suburb small water supply pipe network reconstruction project in 2015.
    • Wuzhong road plays (s20-40 ocean road) road overhaul project.
    • See hengjing station planning through engineering.
    • Loose road on the west side (the changs city - silver ze road) along the green smoke sparse reconstruction project.
    • Minhang district in pudong small water supply pipe network reconstruction project in 2014.
    • Rivers sand town pudong new area from 2013 to 2014 in middle and small river comprehensive maintenance.
    • Zhangjiang central - 2-2 D plot construction afforestation planting project in new projects.
  • Housing building
    • Shanghai yi tong commercial plaza.
    • Sheshan north large residential community 15 a - 02 a plot.
    • Baoshan city purple Chen yuan three phase of the project.
    • Zhabei Peng Pu town 334 neighborhood 87 hill plot project.
    • Pudong new area, Shanghai supporting commercial housing ZhuQiao no.4 lot of phase ii project.
    • Sheshan north 14 a large residential community - 03 - a plot.
    • In northern new zhabei sports center (including community culture activity center).
    • ZhuQiao new town investment company C block (land) 2-3-1 newly built commercial housing projects.
    • Oasis bentley garden for three phase of the commodity residential house.
    • Zhabei 411 neighborhood 26 hill plot project.
    • Zhabei north station street lane 43 10 high commercial recreational housing project.
    • Pudong new area, Shanghai supporting commercial housing ZhuQiao no.4 lot of phase ii project.
    • See hengjing south large residential community housing and public facilities projects.
    • Navigation pavilion home buyers E - 2 plots for commercial housing construction projects.
    • Shibei hi-tech industry park of standard factory building construction project.
    • The reconstruction of the northern suburb of cold storage of Shanghai fruit co. LTD.
    • New Peng Pu town of science and technology industrial neighborhood 3 # C - 1 block building.
    • Shanghai caohejing taopu wisdom of science and technology city.
    • Double happiness in Shanghai songjiang industrial park project.

Baoshan city purple Chen yuan three phase of the project

Construction area: 164237.15 square meters.
Entrusted agent content: design, construction general contracting two (blocks), construction supervision bid (2) the bidding agent.

Kong Li huaihe river bridge construction projects

Construction area: 10.12 km, of which the huaihe river bridge on 5.266 kilometers long.
Agent content: supervision and monitoring the tender.

Pudong new area, Shanghai supporting commercial housing ZhuQiao no.4 lot of phase ¢òproject

Construction area: 150421 square meters.
Agent content: construction supervision bidding, bidding for construction (including the listing and the bidding price control).

Shanghai yi tong commercial plaza

Construction area: 20145 square meters.
Agent content: the construction and construction supervision agency.

Sheshan north large residential community 15 a - 02 a plot

Construction area: 172944 square meters.
Agent content: design investigation integration bidding agent.

¡¾ÍøÕ¾µØͼ¡¿¡¾sitemap¡¿